Resultados de la búsqueda: 2 vacantes

 ...electronic and pneumatic instrumentation. Install, program, maintain, and repair control systems and associated equipment Perform Factory Acceptance Tests (FAT), Site Acceptance Test (SAT), Performance Acceptance Test (PAT), control wiring design, and logic design.... 

LHR Global

Santander
Hace 12 días
 ...review power systems designs for new projects and for extensions to existing systems. Review installation, site commissioning, and factory acceptance testing for low and high-voltage transformers, switchgear, circuit breakers, and control gear. Analyze the components... 

LHR Global

Santander
Hace 12 días